Securing your solar subsidies
We integrate central and state incentives directly into your solar EPC contract, reducing capital expenditure by up to forty percent with guaranteed compliance.
Approved incentive structures
We align your system design with active regional policies to maximize direct financial assistance and long-term tax benefits.
PM-Surya Ghar
Commercial Depreciation
Grid-Tie Net Metering
Direct financial assistance for residential grid-tied setups up to 3kW, managed and commissioned end-to-end by our certified team.
Accelerated depreciation benefits for industrial installations, allowing businesses to write off significant capital costs in year one.
Seamless integration with regional power distribution companies to credit your surplus energy back to the grid automatically.
Zero-friction compliance
We handle the entire administrative and technical lifecycle—from initial feasibility studies to final subsidy disbursement.
1. Load Analysis
2. Liaison Filing
3. Commissioning
Our structural engineers conduct load testing and solar irradiation mapping to verify roof suitability and meet strict state criteria.
We prepare detailed engineering schematics and manage approvals with state electricity boards and national subsidy portals on your behalf.
Following physical installation, we secure net-metering activation and coordinate the final inspection to trigger direct subsidy release.
Clear answers on solar policy
Who qualifies for the central subsidy?
Are Tier-1 components mandatory for subsidies?
Residential grid-tied systems up to 10kW qualify for direct central subsidies. Commercial and industrial systems benefit from accelerated depreciation and custom state-level incentives.
Yes, government guidelines require Domestic Content Requirement (DCR) certified modules for residential subsidies. We procure strictly approved, high-yield components.
How long does the approval process take?
When is the subsidy amount disbursed?
Typically, state approvals and net-metering commissioning take six to eight weeks. Our dedicated liaison team manages all paperwork to prevent administrative delays.
Subsidies are credited directly to your registered bank account within thirty days of successful net-metering commissioning and joint physical inspection.
Ready to analyze your subsidy savings?
Schedule a detailed site assessment and structural load analysis with our New Delhi engineering team.
